Scope-of-Work includes installation, operation and maintenance of a deep well groundwater dewatering system, relocation of existing conflicting utilities, installation of a sheet pile shoring system, excavation and construction of a 50-foot deep reinforced concrete sewage pump station including associated piping and mechanical, and electrical systems. Additional work includes geotechnical instrumentation and monitoring, installation of approximately 350 lf of 24-inch diameter gravity sewer via microtunnel methods, paving, grading and landscaping work and the abandonment of two (2) existing sewage lift stations.
|